The U Move bus charging station adopts two 750kW charging containers, each consists of one container and five outdoor chargers. With centralized intelligent management, they’re of higher safety and reliability. While maintaining the outstanding performance, SSE has also upgraded the process and appearance of the containers to meet higher requirements. The container is connected to the outdoor dual-connector chargers, which can charge 10 buses at the same time. The power of a single charger is 150kW, and the two-hour 12-meter pure electric bus can be filled simultaneously in 2.5 hours.